
Add to Cart
China suppliers Customized CNC machinery parts PTFE machined parts
Product Information
Product category | PTFE CNC machining |
Material available | Stainless steel, aluminum, copper, alloy steel, PTFE, PEEK, nylon, etc. |
Surface treatment | Anodizing, Sandblasting, Heat treatment, Polishing, Powdering, PVD coating, electroplating, silkscreen etc. |
Tolerance | ± 0.01mm |
Quality control | 100% inspection before shipment |
Experience | 15 years of professional OEM service |
Packaging | Safety packaging, or as per customers' requirement |
Lead time | 3-5 days for sample, and 30 days for mass production generally. It can be adjusted according to customers' request. |
Term of payment | T/T, PayPal, etc. |
File formats | Pro-E, SolidWorks, AutoCAD, PDF, or Others. |
Recommendation Material:
High Performance Material | Engineering Plastics Material | High Cost Performance Material |
PEEK | PEI(ULTEM) | ABS |
CERAMIC PEEK | UNILATE | PVC |
PAI(TORLON) | PPS | CPVC |
PI(VESPEL) | PSU/PPSU | POM(DELRIN) |
PBI | PVDF | PA/PA6/PA66/PA12/PA12C/PA12G/NYLON |
PCTFE | PTFE | PC |
PFA | PMMA(ACRYLIC) | |
PET/PETP | PP | |
PPO | PE/PE1000/UPE/UHMW | |
PBT | PU |
QC(inspection everywhere)
- Technicians self-check in production
- Engineer spot check in production.
- QC inspect after products finished
- International sales who were trained the technical know-how spot check before shipping to ensure the quality.
Are you manufacturer or trade company?
We are 100% manufacturer and have been in this field for more than 15 years.
What is the necessary information for a quote?
Please provide the details of your requirement as clear as possible (material, surface finish, drawing, tolerance, quantity etc.), it is better to contact us by Skype, email or phone call in case of any delays.
What kind of raw material can you use?
Stainless steel, aluminum, copper, brass, alloy steel, PTFE, PEEK, nylon, etc.
What kind of surface finish can you provide?
Powdering, polishing, plating, anodizing, hot-dip galvanizing, PVD coating,etc.
How about the lead-time for an order?
It depends on your order quantity, 7-20 working days after confirmation of the order is required generally.
What is the payment term?
30% deposit in advance, balance before shipment.