
Add to Cart
Product Information
Product category | Plastic CNC machining |
Material available | Stainless steel, aluminum, copper, alloy steel, PTFE, PEEK, nylon, etc. |
Surface treatment | Anodizing, Sandblasting, Heat treatment, Polishing, Powdering, PVD coating, electroplating, silkscreen etc. |
Tolerance | ± 0.01mm |
Quality control | 100% inspection before shipment |
Experience | 15 years of professional OEM service |
Packaging | Safety packaging, or as per customers' requirement |
Lead time | 3-5 days for sample, and 30 days for mass production generally. It can be adjusted according to customers' request. |
Term of payment | T/T, PayPal, etc. |
File formats | Pro-E, SolidWorks, AutoCAD, PDF, or Others. |
Our Advantages
1.Equipment:well-equipped facilities,and most of them imported from abroad with high Precision.
2.Communication: response within 12hours,and great technical support over 10 engineers.
3.Experience: over 10years experience working in machining/molding line.
4.Quality:100% inspected,and replacement free of charges if any quality problem from my company.
ONE-stop service from engineering- prototyping- production- post processing- assembly- packing.
Packing & Shipping
1) by Courier: 2-4 working days door-door like DHL, Fedex, or UPS
2) by Air: 4-6 working days to your appointed airport
3) by Sea: 15-25 working days to your appointed seaport
Are you manufacturer or trade company?
We are 100% manufacturer and have been in this field for more than 15 years.
What is the necessary information for a quote?
Please provide the details of your requirement as clear as possible (material, surface finish, drawing, tolerance, quantity etc.), it is better to contact us by Skype, email or phone call in case of any delays.
What kind of raw material can you use?
Stainless steel, aluminum, copper, brass, alloy steel, PTFE, PEEK, nylon, etc.
What kind of surface finish can you provide?
Powdering, polishing, plating, anodizing, hot-dip galvanizing, PVD coating,etc.
How about the lead-time for an order?
It depends on your order quantity, 7-20 working days after confirmation of the order is required generally.
What is the payment term?
30% deposit in advance, balance before shipment.