
Add to Cart
High precision Brass/Copper part cnc turning machining parts
Product Information
Product category | Copper CNC machining |
Material available | Stainless steel, aluminum, copper, alloy steel, PTFE, PEEK, nylon, etc. |
Surface treatment | Anodizing, Sandblasting, Heat treatment, Polishing, Powdering, PVD coating, electroplating, silkscreen etc. |
Tolerance | ± 0.01mm |
Quality control | 100% inspection before shipment |
Experience | 15 years of professional OEM service |
Packaging | Safety packaging, or as per customers' requirement |
Lead time | 3-5 days for sample, and 30 days for mass production generally. It can be adjusted according to customers' request. |
Term of payment | T/T, PayPal, etc. |
File formats | Pro-E, SolidWorks, AutoCAD, PDF, or Others. |
Business Scope
1. CNC machining parts, precision parts, CNC parts, metal machining parts.
2. CNC turning parts, CNC turned parts,Lathe parts, turned parts.
3. CNC milling parts, CNC milled parts, metal milling parts.
4. CNC machined parts,CNC machine part, CNC machinery parts.
5. Metal parts, Auto parts, mechanical parts.spare parts,accessories,hardware.
Testing Machine: Digital Height Gauge, caliper, CMM, projector, roughness tester, hardness tester, etc
Packing: Foam, Carton, Wooden boxes, or as per the customer’s requirements
Drawing Format: .jpg/ .pdf/ .dxf/ .dwg/ .igs./ .stp/ .x_/, etc
Our advantage: Superior in quality,reasonable in price and deliver on time
Are you manufacturer or trade company?
We are 100% manufacturer and have been in this field for more than 15 years.
What is the necessary information for a quote?
Please provide the details of your requirement as clear as possible (material, surface finish, drawing, tolerance, quantity etc.), it is better to contact us by Skype, email or phone call in case of any delays.
What kind of raw material can you use?
Stainless steel, aluminum, copper, brass, alloy steel, PTFE, PEEK, nylon, etc.
What kind of surface finish can you provide?
Powdering, polishing, plating, anodizing, hot-dip galvanizing, PVD coating,etc.
How about the lead-time for an order?
It depends on your order quantity, 7-20 working days after confirmation of the order is required generally.
What is the payment term?
30% deposit in advance, balance before shipment.